All Aspects of Building Work Undertaken

Extensions

We offer Design, Planning and Build Services for all Extensions. We can also advise on permitted development queries free of charge.

Loft Conversions

From Internal conversions to double dormers, we can offer competitive rates for your Loft Conversion Project. 

Garage Conversions

We professionally convert your unusable garage into a habitable space, 100% compliant with building regulations. 

Bespoke Garden Rooms

We provide supply and fit solutions all kinds of Bespoke or Pre-fabricated Garden Rooms. 

Refurbishments

We can simply add a touch of paint or undertake a full refurbishment. Whatever your needs, we can help. 

Small Projects

From Carpentry to Decoration, we can provide our services to complete any size project.  

Case Study - Garage CONVERSION Waltham Cross

Week 1

 

The first week of this project, we rebuilt the entire roof internally by sistering all existing rafters with 6x2 timbers. We did this to convert the truss roof system to a self supporting cut roof in order to achieve a vaulted ceiling finish. We installed 200+ timber lock structural screws, 1000+ nails and 300+ screws. Additionally we have built the last rafter into a new truss and chemically fixed it to the main house with M16 bolts, bolted all sistered rafters with M16 bolts and washers and finally installed restraint straps to connect the rafters to the existing brickwork. 

On top of this, we have also achieved the following:

- One External Wall And One Internal wall removed
- One 152 UB RSJ Installed and One 178 UB RSJ Installed
- Brickwork Installed to front garage door opening in preparation for window installation.
- DPM Installed to Floor to prevent moisture rising
- PIR Insulation Installed to the floor with Aluminium foil tape to seal all gaps. 

Week 2

 

Week 2 consisted of the following works: 


- Vapour Barrier Installed to prevent moisture ingress
- Internal stud walls built to create a cavity wall
- Ceiling Insulated with 100mm PIR between the rafters and 70mm PIR overboard
- Walls insulated with 100mm PIR
- Plasterboarding 70% complete

Week 3

 

Our 3rd and final week at Waltham Cross consisted of the following works: 


- Two Velux Windows Installed
- Bifolds Supplied and Installed
- 1800 x 1000 PVC Window Installed
- Plasterboarding Complete
- Plastering Complete
- Self Leveling Compound supplied and Installed to 40sqm of floor
- 40sqm of LVT herringbone flooring installed
- Skirting, Architrave and Window board Installed
- Decoration Completed
- Two new Oak doors Installed with Ironmongery

    Get in touch for a FREE Quotation

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    Message us on WhatsApp

    JB Building Projects Ltd

    07984434874

    • Our Work
    • Privacy Policy

    Copyright © 2024 JB Building Projects Ltd - All Rights Reserved.

    Powered by GoDaddy

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    DeclineAccept